Heavy Haul Services / Superloads
The moves that need engineering, bridge analysis, utility coordination and a police escort. When the load is genuinely one of a kind, this is the team.
Every state draws the superload line in a different place. Generally you are in superload territory once you pass roughly 150,000 pounds gross, or 16 feet wide, or 16 feet tall, or 150 feet long. Some states set it lower. A few set it by axle loading rather than gross weight.
What actually matters is what changes when you cross that line. A superload permit is not a bigger version of a regular permit. It triggers a different process: engineering review, bridge analysis, a physical route survey, utility and police coordination, and often a public notice period. Timelines can range from days, to weeks, to months.
150,000
lbs gross, roughly
16 ft
wide
16 ft
tall
150 ft
long
Typical thresholds. Your state's line may sit lower.
What actually happens
Exact weight, dimensions, center of gravity, pick points and how the load can be supported. We work from the manufacturer's drawings, not from an estimate.
This is the technical heart of it. We build the axle configuration to keep individual axle loads inside what each bridge on the route can carry. More axles spread the weight, but they also make the rig longer and harder to turn. That trade-off is the job.
State DOTs run structural analysis on every bridge along the proposed route against your specific axle configuration. If a bridge fails, we reroute, reconfigure the axles, or in some cases run a crossing plan with speed and positioning restrictions.
We drive it. Every turn, every clearance, every grade, every signal and sign that may need to come down temporarily.
Line lifts scheduled with the utility. Police escorts arranged with each jurisdiction. Traffic control planned. Sometimes a temporary road closure.
Usually at night or on a weekend, slow, and with a convoy. And usually uneventful, because all the drama already happened in the planning.
A superload rides on a configuration built for that specific load. Multi-axle RGNs, perimeter trailers, jeeps and boosters to distribute weight forward and back, steerable dollies so a 150-foot rig can make a 90-degree turn, and dual-lane setups when the weight cannot be spread any other way.
| Configuration | Width | Deck height | Well length | Capacity |
|---|---|---|---|---|
| 9 axle | 8’6”–10’ | 18”–26” | 25’–50’ | Up to 150,000 lbs |
| 13 axle | 8’6”–12’ | 18”–30” | 25’–72’ | Up to 180,000 lbs |
| 19 axle steerable | Load specific | Load specific | 25’–70’ | Up to 250,000 lbs |
| Perimeter trailer | Load specific | Load specific | Load specific | Up to 135,000 lbs |
| Steerable dolly | 10’ typical | Load specific | Load specific | Up to 120,000 lbs |
Ranges are typical, not limits on what we will look at. Some of this equipment is ours and some is sourced through the Sims Global network. We tell you which is which on your move, so you know exactly who is behind every axle.

Why Kodiak
Superloads reward paranoia.
We would rather spend an extra week on the route survey than find out at 2am that a signal arm is four inches too low. Our planning is in house, our equipment is ours, and the person who scoped your move is the same person you can call at midnight during it.
What buyers ask us first.
Six to sixteen weeks is typical, driven mostly by the states involved and whether bridge analysis is required. Some states are consistently fast. Others are not. We will give you a realistic window at the start rather than an optimistic one.
State engineers model your specific axle configuration against each bridge on the route to confirm it can carry the load. It is a queue, and you are in it with everyone else. It is also the reason superloads almost never fail structurally, so it is worth the wait.
On most superloads, yes, and often in every jurisdiction you pass through. We coordinate that.
Sometimes. Route surveys identify it in advance, and we schedule the utility work as part of the move plan.
Yes. We provide crane and rigging for loading and offloading, and we can stage the load at one of our laydown yards if the receiving site is not ready.
It is the question every serious buyer asks, and it deserves a straight answer with real numbers. Call a project engineer and we will tell you the heaviest, widest and longest loads we have run, and which of them looks like yours.
Superloads are won and lost on lead time. Even if your project is months out, a fifteen minute call now tells you what the permit window looks like and whether your route has a problem in it.