Services / Project Logistics

Project Logistics

One team managing the transportation, storage, staging and delivery sequence for your entire project. From the plant floor to the pad, in the order your crews actually need it.

The Freight Is Rarely the Hard Part

On a big build, moving any single piece of equipment is a solved problem. What goes wrong is everything around it. The transformers arrive six weeks before the pad is poured. The switchgear shows up in the wrong order and now a crew is standing around. Three carriers are on site the same morning and there is one crane. Somebody has to hold two hundred loads worth of equipment somewhere, and the site has no room.

That is the actual job. Not hauling. Choreography.

Not hauling. Choreography.

The Whole Chain, Not Just the Truck

Planning and engineering

Route surveys, permit strategy, equipment selection and a delivery sequence built backward from your construction schedule.

Transportation

Heavy haul, oversize, superloads and standard freight, on our equipment and through the Sims Global network when volume calls for it.

Laydown and storage

Secured yards where equipment lands, gets inventoried and waits until the site is ready for it.

Transloading and material handling

Rail to truck, truck to truck, and the crane and forklift capacity to do it.

Staging

Equipment positioned and sequenced near or on site ahead of installation.

Sequenced final mile

Loads released to the pad in installation order on the morning the crew needs them.

How a project actually runs with us

What the First Ninety Days Look Like

  1. 01

    We get your schedule, not just your freight list.

    Install dates drive everything backward: delivery windows, storage duration, permit lead times, trailer selection.

  2. 02

    We build the move plan.

    Every piece mapped to a trailer configuration, a route, a permit timeline and a storage plan if it lands early.

  3. 03

    We start receiving.

    Equipment arrives at our yard, gets inspected, photographed, and inventoried. You get visibility on what is on hand.

  4. 04

    We hold and protect.

    Sometimes for a week, sometimes for eight months. Secured, monitored, and accounted for.

  5. 05

    We deliver the sequence.

    Your superintendent tells us what is needed and when. We put it on the pad that morning, in that order.

  6. 06

    We flex when the schedule moves.

    Because it will. Owning the yard and the trucks is what makes re-sequencing a phone call instead of a change order.

Data center equipment being transported

If You're Building Something Big

  • Data center developers and their EPCs
  • Utilities and IPPs building generation and substations
  • Industrial and manufacturing plant expansions
  • Renewable energy construction

Anyone whose project has more equipment than site, and a schedule that does not forgive a late transformer.

We Own the Parts That Usually Get Subcontracted

Most project logistics providers coordinate. They are good at it, but when the schedule slips they have to renegotiate with a carrier, a yard operator and a crane company, all of whom have their own customers.

We own the trucks, the trailers, the yards and the relationships. When your date moves, we move. And when a project needs modes we do not run, Sims Global covers it without you having to find another vendor.

Trucks

Trailers

Yards

Relationships

Questions Project Teams Ask

Can you take over a project that has already started?
Yes, and it happens more than you would think. Usually the call comes when storage runs out or a sequence falls apart. Give us the current freight position and the remaining schedule and we will build a plan from where things actually are.
How long can you store equipment?
As long as the project needs it. Some equipment sits with us for a week, some for the better part of a year.
Do you provide inventory visibility?
Yes. Equipment is inspected, photographed and inventoried on receipt, and you get reporting on what is on hand and what has been released.
What if my site cannot take a full size truck?
That is a common reason people call us. We stage nearby and shuttle in with equipment sized for the site access.
Do you handle the small freight too, or just the big stuff?
Both. The oversize pieces run on Kodiak equipment. Truckload, LTL and expedited run through Sims Global. You deal with one team either way.
How early should we bring you in?
Earlier than most people do. If we are in the conversation while the schedule is still being built, we can flag permit lead times and site access problems while they are still cheap to solve.

Send Us the Schedule

Not just the freight list. The schedule. That is where we can actually help.

Request a Quote