Power and Utility Transportation

Substation builds, generation projects and grid replacement work, moved and staged by a carrier that understands what an in service date actually costs you.

Everything on the Grid Is Being Built or Replaced at Once

The transportation piece of a utility project is small in dollars and enormous in consequence.

Load growth is climbing faster than it has in a generation. Data centers, electrification, and new industrial load are all pulling at the same time, while a large share of existing substation equipment is reaching the end of its life. Meanwhile transformer lead times have stretched into years and interconnection queues stack up behind them.

So the equipment you ordered two years ago finally ships, and it absolutely cannot sit on a truck or in the wrong place.

Substation and Generation Equipment

Substation
Power transformers, autotransformers, mobile substations, circuit breakers, reactors, capacitor banks, control houses and relay buildings.
Generation
Turbines and turbine components, generators, HRSG modules, gensets, condensers, heat exchangers.
Transmission and distribution
Transmission structures and poles, conductor and cable reels, insulator assemblies, pad mount and pole mount equipment.
Storage and renewables
BESS containers and racks, inverters, collector substation equipment.
Support
Bulk material, spare equipment and storm stock through the Sims Global side.

The Constraints Nobody Outside the Industry Sees

Outage windows are immovable

The crew, the switching order, and the customer notifications are all built around a fixed window. A late delivery does not slip the job by a day, it slips it to the next window, which might be a season away.

Equipment is irreplaceable in the short term

With lead times where they are, a damaged transformer is not a warranty claim, it is a multi year problem. Handling matters more than speed.

Sites are remote and access is rough

Substation sites are often at the end of a gravel road with a turn a truck was never meant to make. Access surveys are not optional.

Impact recorders and handling specs

Utility equipment ships with monitoring and specific handling requirements. We work with them and document it.

Storm response is a different mode entirely

When it matters, it matters immediately.

Hauling, Holding and Setting

Turn a chaotic outage week into a scheduled one

A substation project can stage its entire equipment package at our yard and take delivery in the switching order.

  1. 01

    It arrives when the manufacturer is ready

    Often months ahead of your window.

  2. 02

    We hold it in our yard

    Off the road and out of the wrong place, until your window opens.

  3. 03

    It ships in switching order

    Delivered to the schedule your crew is working from.

We Plan Like the Date Can't Move, Because It Can't

Utility work rewards carriers who over prepare. We survey the access road before we quote the delivery. We confirm the crane plan before the equipment leaves the yard. We build permit timelines with slack in them, because a permit that comes back a week late does not just cost a week when there is an outage window on the other end.

And because we own the yards, we can take delivery of your equipment whenever the manufacturer is ready and hold it until your window opens.

Questions Utility Teams Ask

Can you store equipment until our outage window?
Yes, and it is one of the most common reasons utilities call us. Equipment often arrives months ahead of the window.
Can you deliver into a live substation?
Yes, working to your access, safety, and switching requirements. We will want a site walk first.
Do you handle equipment with impact recorders and handling specs?
Yes. We work to the manufacturer's handling requirements and document the move.
Can you set equipment on foundations?
Yes, we provide crane and rigging for setting.
What about storm and emergency response?
Call us. Between our fleet and the Sims Global network we can usually mobilize quickly, and we will be straight with you about what is realistic.
Can you take rail delivery?
Yes, we transload rail to truck. Tell us where the equipment is arriving and we will confirm the transload location that fits your project.
Do you work with utilities, IPPs and EPCs?
All three, and often more than one on the same project.

When's Your Window?

Give us the in service date and what is on order. We will work backward from there.