Laydown Yards and Project Storage

Secured acreage where your equipment lands, waits and gets released to the jobsite exactly when you need it. With cranes, material handling and inventory control on site.

Check Yard Availability

The Problem

Your Equipment Is Ready. Your Site Isn't.

This is the most predictable problem in construction and nobody plans for it. Equipment lead times are long, so you order early. Then the pad slips, or the building is not weather tight, or the electrical room is not ready. Now you have a few million dollars of switchgear headed your way and nowhere to put it.

The usual answers are all bad. Pay demurrage. Cram it onto a site that has no room. Leave it in a field with a fence around it and hope. Or push the delivery back and lose your place in the manufacturer's schedule.

There is a better option, and it is boring on purpose: put it in our yard.

Heavy equipment staged in a secured laydown yard

What Our Yards Do

More Than a Fence and Some Gravel

01

Receiving and Inspection

Every piece checked in, photographed and documented on arrival, so damage claims have evidence behind them.

02

Inventory Management

You know what is on hand, where it sits, and what has been released.

03

Outdoor Laydown

Improved, drained surface with crane access for heavy and oversize equipment.

04

Indoor and Covered Storage

For equipment that cannot sit in weather.

05

Crane and Material Handling

Cranes and forklifts on site, so loading and unloading does not need a third party mobilization.

06

Transloading

Rail to truck and truck to truck without a separate facility.

07

Security

Fenced, lit, monitored, and staffed.

08

Sequenced Release

The part that matters most. We deliver to the pad in the order your crews need it.

Sequenced Delivery

Load 41 on Tuesday Morning, Because That's What You Asked For.

Here is the thing storage on its own does not solve. Equipment sitting in a yard is only useful if the right piece can get to the site on the right morning without a two week scramble.

Because we own the yard and the trucks, that is a scheduling conversation and not a procurement exercise. Your superintendent tells us what is needed. We stage it, load it and put it on the pad. If the sequence changes on Thursday, we re-sequence on Thursday.

What We Store

If It Fits on a Trailer, It Fits in Our Yard

Transformers and SwitchgearGenerator Sets and GensetsChillers and CRAC UnitsModular and Skidded EquipmentStructural Steel and PrecastWind and Solar ComponentsProcess Equipment and Pressure VesselsConstruction and Heavy EquipmentCable Reels, Conduit and Bulk Material

Why Kodiak

The Yard and the Trucks Are the Same Company

Plenty of places will rent you space. Fewer will inventory it properly. Almost none of them can also put it on a trailer and have it on your pad by 7am.

Storage without transportation is a parking lot. Transportation without storage means your freight arrives whether you are ready or not. We do both, from the same yard, with the same team.

FAQ

Laydown Yard Questions

How much space do you have?
Availability moves with project cycles, so call us for current capacity.
How is it priced?
Typically by area and duration, with receiving and handling quoted separately. Long project commitments price better than month to month. We will give you a straight number rather than a range that changes later.
Is it insured?
Ask us for our current coverage and limits and we will send them over before you commit.
Can I send my own truck to pick something up?
Yes, though most customers have us deliver since we are already loading it.
Do you offer indoor storage?
Some equipment should not sit outside through a Midwest winter and we will tell you when that applies to yours. Ask us which yards have indoor or covered space.
How fast can you release something?
For a planned sequence, on the scheduled morning. For an unplanned pull, usually same day or next day depending on how it is stacked and how far it is going.
Can you receive directly from the manufacturer?
Yes. Many customers have the OEM ship straight to our yard and never touch the freight until it goes to site.